Colorado Master Plumber License Exam Exam Prep
Free practice questions

Free CO-MP Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The CO-MP exam has 120 questions and runs 4 hours 30 minutes.

These 10 free CO-MP questions are organized by exam domain, so you can see how each part of the Colorado Master Plumber License Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Water Supply

Question 1

A fertilizer-injection unit is hard-piped to a potable irrigation supply. Its booster pump can produce 95 psi while the supply is at 60 psi. The chemical mixture is a health hazard, and the design calls for a listed mechanical backflow assembly rather than an air-gap break tank. Which assembly protects against the hazard and the possible reversal mechanism?

Show answer & explanation

Correct answer: A - Reduced-pressure principle assembly, ASSE 1013.

Domain 2: Vents

Question 2

Two bathroom groups on the same floor use a correctly sized horizontal wet vent. The drainage sequence runs from the dry-vented lavatory connections through the bathtub and water-closet connections to junction J, the downstream end of the wet-vented section. A separately trapped and vented laundry standpipe is being added. Where may its drain join without disqualifying the bathroom wet vent under the 2021 IPC?

Show answer & explanation

Correct answer: C - Downstream of junction J, after the wet-vented section.

Domain 3: Fixtures and Equipment

Question 3

A lodging renovation supplies several showers through a central valve listed only to ASSE 1017. Each shower still has an ordinary two-handle faucet. Users experience abrupt temperature changes when nearby fixtures open, even though the central mixing valve works as designed. The fixture-level protection required by the 2021 IPC is:

Show answer & explanation

Correct answer: C - An individual ASSE 1016 automatic compensating valve installed at every shower.

Domain 4: General Regulations

Question 4

Before concealment, new PEX water-distribution piping must be tested for a system working pressure of 70 psi. All proposed test pressures are within the component ratings. Which procedure satisfies the 2021 IPC test requirements?

Show answer & explanation

Correct answer: A - A water test maintained at 80 psi for 20 minutes without leakage.

Domain 5: Traps, Interceptors, and Separators

Question 5

After a mechanical room has been unused for several months, sewer odor is traced to a dry floor-drain trap. Refilling the intact trap stops the odor. The vent is clear, and discharging nearby fixtures does not disturb the restored seal. The owner wants evaporation protection without adding a potable-water primer connection. Which installation is permitted by the 2021 IPC?

Show answer & explanation

Correct answer: A - Retain the P-trap and add a listed ASSE 1072 barrier-type trap-seal protection device.

Domain 6: Storm Drainage Systems

Question 6

A roof-drain submittal covers 2,400 square feet of horizontal roof projection. One 800-square-foot vertical wall drains rainwater onto that roof. The specified 100-year, 1-hour rainfall intensity is 4 inches per hour, and water head at the drain may not exceed 2 inches. Four drain options are rated at that head. Using Q = 0.0104 × rainfall intensity × effective drainage area, with Q in gpm, which is the smallest adequate rating?

Show answer & explanation

Correct answer: C - 130 gpm

Domain 7: Sanitary Drainage Systems

Question 7

A new building has basement fixtures on a finished floor at elevation 98.0 ft and ground-floor fixtures at elevation 109.0 ft. The next upstream public-sewer manhole cover is at elevation 102.4 ft. Both groups can drain by gravity, and their branches join before leaving the building. Select the backwater-valve arrangement that complies with the 2021 IPC.

Show answer & explanation

Correct answer: D - Protect only the basement branch, upstream of the junction.

Question 8

A coordination check of a 4-inch building drain records four details below. Which detail requires correction under the 2021 IPC?

Show answer & explanation

Correct answer: D - A fixed cabinet leaves 14 inches of working clearance in front of a cleanout opening.

Domain 9: Isometric Analysis

Question 9

A straight pipe spool will connect two parallel horizontal runs through a pair of 45-degree fittings. The centerlines are displaced 6 inches sideways and 8 inches vertically; both displacements are perpendicular to the original direction of the runs. Use a net fitting allowance of 1.25 inches at each end, including joint engagement. What cut length is needed, to the nearest tenth of an inch?

Show answer & explanation

Correct answer: B - 11.6 inches

Domain 11: Water Heaters

Question 10

A pressure logger on a home's cold-water piping records 58 psi with the storage water heater off. With all fixtures closed, pressure climbs gradually to 112 psi during a heating cycle, then returns to 58 psi when a faucet is briefly opened. Utility-side pressure stays steady, and the rise does not occur with the heater off. A service backflow assembly was recently installed; there is no expansion-control device. Which correction addresses the cause?

Show answer & explanation

Correct answer: A - Install a correctly sized expansion tank on the cold-water line between the backflow assembly and heater.

The rest of the CO-MP blueprint

The CO-MP exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CO-MP questions with explanations.

Continue in the free practice test →

View plans